Instructions: Using the same set of drawing you are now going to do a material take off of the wall section of the garage. You are to start with Sheet 2 and estimate the amount of soil to be removed or added, calculate the amount of concrete for the driveway and sidewalk for this assignment. Feedback: What you submitted for this assignment is not what I was looking for regarding the calculation of the cubic yards required for the project. The information should be presented as totals for each component. For example: Driveway: XXXX cubic yards Sidewalk: XXXX cubic yards Support footing: XXXX cubic yards Wall support: XXXX cubic yards Gravel under slab: XXXX cubic yards Garage slab: XXXX cubic yards Total concrete required: XXXX cubic yards Also, where is the steel included in your calculations? There may be other items that could be included, but since they are not shown on the drawings, I will not require them (for example, wire mesh or visqueen). I do not need to see how you calculated the valuesonly the final whole-number totals for each part of the project.

Leave a Reply
You must be logged in to post a comment.