It would not let me add the additional 40 within the original assignment.I dont mind adding an additional 40$ if you can create a write up of what was added and where within the file it was added. Also the loacation of each required tasks that were complete(the task tracker)I have to merge with the classes code. I dont want to break there code accidentally.

Leave a Reply
You must be logged in to post a comment.